Energy simulation
Energy simulation: know what works before you invest
Solar panels, a heat battery, an e-boiler or a flexible grid contract: each choice affects the others. HyKro simulates your energy system using your own consumption data and works out three scenarios. You see in advance what each option costs, returns and saves in CO2. The first conversation, the intake, is free.
What we model
We build a model of your site, hour by hour over a full year, and look at the whole system rather than a single technology.
-
Generation
Your own solar or wind capacity, now and after expansion, and how much of it you can use yourself.
-
Storage
Heat storage and, where it pays off, a battery as well: which size suits your load profile.
-
Conversion
From power to heat with an e-boiler, heat pump or heat battery, alongside or instead of your gas boiler.
-
Grid connection and contract
Your connection capacity, contracted capacity and the options for flexible or time-of-use grid contracts.
-
Prices and levies
Dynamic power prices, gas price, network tariffs, energy taxes and the expected carbon price.
-
Subsidies and tax schemes
Which schemes apply in the Netherlands, Germany or Belgium and what they mean for each scenario.
What you get
Well-founded advice you can use for your investment decision, your talks with the grid operator or a subsidy application.
- A site visit to look at your installations, space and grid connection
- Three scenarios tailored to your situation, for example more solar with heat storage, electrification with a flexible grid contract, or a combination
- For each scenario: investment, annual energy costs, payback time and CO2 reduction
- A recommended set-up with the sizing of generation, storage and conversion
- A report with all assumptions and results
- A presentation of the results to you and your team
What we need from you
The better the data, the sharper the result. Missing something? We will help you obtain it.
- Your power and gas use covering at least one year, for example from your energy supplier's or grid operator's customer portal
- Energy bills and your current energy contract
- Connection capacity and contracted capacity
- Details of your heat demand: temperature, medium and operating hours
- Any plans for expansion or decarbonisation
How it works
From first conversation to presentation takes 4 to 6 weeks. The first conversation is free.
Free intake
A no-obligation conversation about your goals and situation. If you then choose the simulation, you receive an order confirmation.
Data and site visit
You provide the consumption data and we visit your site.
Simulation
We build the model and work out the three scenarios.
Presentation
We present the results and you receive the report.
Honest advice, even when heat storage is not the best choice
HyKro supplies heat batteries, but the simulation is technology-neutral. If the calculation shows that a heat pump, a battery or a different grid contract works better for you, the report says so. That is worth more to you than a sales pitch, and to us too.
If you choose a HyKro heat battery after the simulation, the simulation serves directly as the basis for the design and the subsidy application.
Questions about the energy simulation
How does it differ from the free heat battery quick scan?
The heat battery quick scan is a first estimate, based on a few key figures, of whether a heat battery suits you. The energy simulation is a full model of your energy system using your own consumption data, with three scenarios, a site visit and a report.
What does the intake cost?
Nothing. The first conversation is free and without obligation, just like the heat battery quick scan: every first contact with HyKro is free. In the intake we discuss your goals, what data is available and whether an energy simulation makes sense for you. You only pay the introductory price if you then choose the simulation.
What does introductory price mean?
For a limited period we offer the energy simulation at a fixed price of €9,500 excl. VAT. That covers the full package: site visit, three scenarios, report and presentation.
Can I get a subsidy for the simulation?
Sometimes. A simulation can be part of a feasibility study or energy-saving concept, which some schemes support. See subsidies and business case for an overview. During the intake we check whether anything applies to you.
Is the simulation useful without high-temperature heat demand?
Yes. The simulation looks at your whole energy system, not just heat above 120 °C. It also gives valuable insight to companies facing grid congestion, with a lot of own generation or with electrification plans.